Shop

Oval Pool Gre Soaker Hose 700 x 320 x 150 cm H cm
March 21, 2017
Bon Pool 4 M round swimming pools Diameter 1,20 M Depth with Edelstahlleiter
March 21, 2017
Show all

Inground steel pool SKYBLUE COMFORT 800 h.1,20 with Technical Room

£ 3,091.68

  • USD: 3,870.17$
  • EUR: € 3,588.51 (as of March 24, 2017, 1:42 am)

Installation 1. Excavation It must be min. 35 cm larger than the shape of the swimming pool, with a depth which must be the sum of the depth of the bath, the thickness of the slab, the thickness of the drainage gravel layer.2. Housing for the backbone Dug a housing (or proceeds from the slab) which passes through the tank at the intersection of the two semi-circles. The housing must be perfectly level (check with a spirit level).
Fill the housing with the earth and comprimetela or drowned basic beam in concrete.Finally, check again that the media is perpendicular to the ground / the slab.3. BASE RCK 250 concrete must be at least 30 cm larger than the shape of the pool, with a minimum thickness of 10-15 cm and reinforced with welded Ø 8 mm, 20×20 cm. The surface must be smoothed with fine sand. The slab must be placed onto a layer of minimum 5 cm drainage gravel.
4. Wall Containment With hollow blocks to build a retaining wall for each long side of the pool. The two parallel walls will have to be armed with iron rods Ø 8 mm positioned every 50 cm and fixed to the iron bullets on the slab.5. Installation of the steel structure Lay the guides below ground incastrandole to each other until the entire shape of the pool.

Compare

Pool Kit: 1. Steel structure corrosion resistant, with mounting profiles.The panels of the vertical perimeter structure are already drilled for the installation and mounting of the skimmer, the inlets and the accessories required in the delivery. 2. Liner Liner internal 60/100 PVC attached needle, elastic and very robust, tratttato UV and algae. Liner color blue.3. Technical room to be buried utility room ideal for small pools or above ground pools. Dimensions: 97×56 cm – h 80 cm. The utility room is equipped with: > Elegant gelcoat finish, which gives absolute impermeability to the local, avoiding the potential of infiltration from the outside; > Reinforced cover anti-slip; > Key-controlled safety hinges and closing; > Sand filtration system, already assembled; > Pipes and fittings and PVC, including ball valves for adjusting the go with the flow of water.4. Kit skimmer and drain hole For connection to the filtration system.5.Felt bottom mat For added comfort and safety, the liner rests on a rot-resistant bottom felt, anti-bacterial and fungicidal.6. Cleaning Kit: telescopic care for, floating tube, brush 45cm wall, mop triangular vacuum point ballasted, scoop surface, cosmetic bag for analysis and regulate of chlorine-pH values, floating thermometer.7. 304 stainless steel ladder Ladder design and elegant style with vertical bars that facilitate access to the pool.
Installation 1. Excavation It should be min. 35 cm larger than the shape of the swimming pool, with a depth which should be the sum of the depth of the bath, the thickness of the slab, the thickness of the drainage gravel layer.2. Housing for the backbone Dug a housing (or proceeds from the slab) which passes through the tank at the intersection of the two semi-circles. The housing should be perfectly level (check with a spirit level).
Fill the housing with the earth and comprimetela or drowned basic beam in concrete.In any case, check again that the media is perpendicular to the ground / the slab.3. BASE RCK 250 concrete should be at least 30 cm larger than the shape of the pool, with a minimum thickness of 10-15 cm and reinforced with welded Ø 8 mm, 20×20 cm. The surface should be smoothed with fine sand. The slab should be placed onto a layer of minimum 5 cm drainage gravel.
4. Wall Containment With hollow blocks to build a retaining wall for each long side of the pool. The two parallel walls must be armed with iron rods Ø 8 mm positioned every 50 cm and fixed to the iron bullets on the slab.5. Installation of the steel structure Lay the guides below ground incastrandole to one another until all of the shape of the pool.
Unroll the metal wall, insert it in the lower guides and close it with the rod supplied; then attach the skimmer and nozzle in the holes already present. Inally, fit the upper guides along the whole perimeter of the swimming pool, insert the lining in its seat inside the upper guides.6. Laying of the foundation cloth Lay the protective sheet on the base substrate free from sharp objects. The protective cloth is square and is cut after the assembly of the tank following the sheet.
7. Installation of the liner Get into the tub the use of a scale and lay the liner at the center of the pool. Begin to carry out the liner from the center towards the outside 8. FILLING with water.9. LEAN The finned parts of the pool to fill the gap between the excavation and the pool wall (minimum 25 cm) with lean concrete. This phase should absolutely be at the pool filled to 4/5 of its maximum capacity.

Binding

Kitchen & Home

Brand

PISCINE ITALIA

EAN

1039021124609

EAN List

1039021124609

Item Dimensions

4724, hundredths-inches, 31496, hundredths-inches, 28660, hundredths-pounds, 16378, hundredths-inches

Label

PISCINE ITALIA

Manufacturer

PISCINE ITALIA

Product Group

Kitchen

Publisher

PISCINE ITALIA

Studio

PISCINE ITALIA

Reviews

There are no reviews yet.

Be the first to review “Inground steel pool SKYBLUE COMFORT 800 h.1,20 with Technical Room”

Your email address will not be published. Required fields are marked *